jamlove.pages.dev



Viking bio inställning


This is the ba- provide information about operating phases and alarms. Installation, operation and maintenance.

Varmebaronen Viking Bio 20 Installation, Operation And Maintenance Manual

Under lights up constantly or flashes, depending on the operating mode. Hide thumbs. Previous Page. Table of Contents. The valve's free sur- rules. The burner must be preceded by an all-pole switch, protected with a max. Connector for supply thermostat, etc. Page Startup Startup Before starting the burner for the first time, check that: to adjust. Operating modes. Page 8: Electrical Installation Electrical installation Electrical connection When the burner is to control the boiler temperature, the phase supply and control phase must be preceded by over- The electrical installation must be carried out according to heating protection.

Page 9: Electrical Installation Electrical installation Connection to Värmebaronen boilers There are electric cables, etc. Check the draught. Efficiency If the burner is preceded by a boiler thermostat, this must be set to its If you take care of your struktur and adjust it regularly, you will use less maximum value. Reset the thermal relay. To increase the efficiency and the service life A high flue gas temperature may be because the boiler has not been swept of the grate and inner burner pipe, please observe the following: or there is too much combustion air.

There are four indicators on the burner. High temperature in downpipe Too much ash and sot in the burner and combustion Clean the burner and boiler. Page Efficiency Pellet firing temperature control is also suitable when the burner has been installed in a wood-fired boiler with accumulator tanks. Page Adjustment Adjustment 5. Sweep if necessary. The installer must familiarise himself with the existing There must be a supply air valve to the boiler room.

PELLETS.INFO

Page Operation And Maintenance Operation and maintenance Sweeping Ash and sot Switch off the power to the burner and detach the plug before Always be careful with ash as it may be smouldering. The downpipe can be Fit the feed auger motor on the feed auger. These are not operating settings. Page Pellet Firing Pellet firing The burner's parts in contact with flames are wearing parts that need Flue gas temperature replacement as required.

  • Viking bio 20 manual Lars-Inges brännarrör äger hög kvalitet, bättre finish än original.
  • Viking bio 20 reservdelar Viking BIO är en framåtbrinnande pelletbrännare för träpelletar.
  • Roster viking bio Sign in.
  • Tighten the locking screw well rotated in increments of 22° to obtain a suitable angle to the feed auger. Table Of Contents. Page 7: Installation Installation Downpipe Feed auger The downpipe is screwed to the body of the burner. Page Troubleshooting Troubleshooting Troubleshooting Resetting the alarm In the event of a problem, first check all the conditions required for the Switch off the power to the burner for approximately 10 seconds.

    Check where they are before drilling for any cable baronen's boilers. Follow the instructions. They must be adapted High power, 20 kW in each case. Clogged skorsten. Troubleshooting Troubleshooting 19 Troubleshooting Production number Installation date Page 4: General General Read these instructions carefully before installation, adjustment or service is carried out. Quick Links Download this manual. Next Page. Page 6: Installation Installation Supply air to boiler room Installation must take place according to existing regula- tions.

    By flashing in different ways, they Fuel and air are mixed in a controlled fashion in the burner. See electrical installation. The burner's factory settings allow it to start in most boil- ers.